Every project is different so ProCalc includes this section for you to add any items that are unique to your specific project.
Please note: Extras should be the total retail price to the consumer. That is, you should include costs plus builder’s margin/fees/GST/etc
For negative deductions, insert a “-” sign in front of the cost field. For example if the client is supplying tiles worth $5000, insert “-5000”
Extras should also include anything that is ‘extraordinary’ such as a huge amount of cabinetry or extensive engineering.
PS, provisional sum, PC, prime cost, items, extra
Extra/PS Item |
Batten Screening |
Elevated/Cathedral/High Ceilings |
Central Vacuum |
Cross Over |
Euro Laundry Fireplace |
Extensive Engineering |
Hydronic Heating |
Mechanised Louvres |
Landscaping |
Septic Tank |
Services (eg Headworks) |
Single Glazing Subfloor/Re-stump in Renovation |
Steel Windows Sustainability measures |
Tuck Pointing |
Wine Cellar Roofing for Renovation |
Rough Guide ($) |
$450-$600/m2 |
$300/m2 |
$2,000 |
$3,000 |
$5,000-$10,000 $4,000-$12,000 |
Your call… |
$120/m2 |
Obtain supplier quote |
Your call… |
$20,000-$30,000 |
$10,000-$25,000 |
Deduct $300/m2 $400/m2 |
Obtain Supplier Quote Your call… |
TBC |
Obtain supplier quote Obtain supplier quote |
Other items to count as extras include:
- Water tank
- Retaining wall
- External painting, painting cladding or painting weatherboard for renovation projects (extensions and new builds include the painting in ProCalc’s numbers