• FREE webinar/resources
  • FAQ’S
  • PRICING
  • Testimonials
  • CASE STUDIES
  • Contact
  • Sign up/login

Using ProCalc

73
  • Help/Support
  • Future vs Current Pricing
  • Fixed Expenses, Overheads
  • Outdoor Roof
  • Delete or Archive Project
  • Curtains, Blinds & Window Furnishings
  • Residential vs Commercial Projects
  • First Floor Mezzanine or Void
  • Update Latest Algorithm
  • Plumbing & Electrical
  • GST
  • White Goods & Appliances
  • Add a Lift/Elevator
  • Queenslander Lift & Raise
  • Mouse Instructions, Moving, Zooming In/out plans
  • Calibrate/Calibration
  • Passive House
  • Dual Occupancy or Multi-Dwelling
  • Training/Tutorial
  • Scaling or Scale Tool
  • Measurements Were Too Inaccurate
  • Roof Deck or Rooftop Garden
  • Ground floor vs 1st, 2nd or 3rd Floor
  • Roof Replacement
  • Flooring
  • Plan Uploader
  • Tender Pricing
  • Cabinetry
  • Client Support Requirements
  • Who Sources Builder
  • Construction Contract
  • Client Design Expectations
  • Swimming Pool or Spa
  • Project Type
  • Walls Measurement
  • Walls – Cladding vs Masonry
  • Timeframe (Validity), Forecast, Escalation
  • Stairs External
  • Stairs
  • Solar/Heat Pumps
  • Skylights
  • Site Complications
  • Retaining Walls
  • Renovation Definition
  • Price Range
  • Pergola, Alfresco, Outdoor Area
  • Paving
  • Laundry
  • Kitchen/Bathroom Fixture/Appliances/Fitoff
  • Kitchen Measurement
  • Hot Water Service, HWS, Water Heater
  • Glass Windows or Doors, Openings
  • Garage Door
  • Garage, Shed or Unfinished Spaces
  • Fencing
  • Extras & PS Allowances,
  • Excavation & Soil Removal, Dig, Site Cut, Sloping
  • European Laundry
  • Demolition (By Hand vs By Machine)
  • Decking, Driveways, Outdoor Concrete Slab, Balcony
  • Cosmetic Touch Ups, Light
  • Consultancy Costs
  • Construction or Builder’s Contingency
  • Concrete Slab (outdoors), Carport
  • Client Supplied
  • Chimney Removal
  • High Ceiling Heights, Cathedral
  • Carport, Car Parking
  • Butlers Pantry
  • Builder Preliminaries & Project Management
  • Bathroom vs Powder Room, Water Closet, Toilet
  • Bathroom – New Vs Renovate Existing
  • Heating, Cooling, Air Conditioning, Split-Systems

My Account

9
  • Client Information Brochure ProCalc PDF
  • Book a Free Trial
  • Delete or Archive Project
  • Manage Subscription
  • Subscription/Plan Pricing
  • Change My Payment Details
  • Company Logo
  • Invoices, Receipts
  • Refer A Friend
View Categories
  • Home
  • Knowledge Base
  • Using ProCalc
  • Glass Windows or Doors, Openings

Glass Windows or Doors, Openings

Procalc’s range assumes windows are double glazed with timber, aluminium or PVC frames.

You should measure the m2 of the actual windows.

Openings for full height glazing should be counted as structural wall lengths

Single or triple glazing plus steel frames should be managed using extras/ps allowances.

For single glazing, deduct $300/m2 (of glass) in Extras/PS Items by inserting the equivalent of Window(m2) x -$300. That is, place a negative sign before the total to deduct

Window furnishings are included in ProCalc’s pricing. Their value is managed by client design source.

Updated on April 30, 2024
Hot Water Service, HWS, Water HeaterGarage Door

Powered by BetterDocs